Tunnel Related - Participated as Design Engineer or Project Manager
-
Bakırköy – Bahçelievler – Kirazlı Metro System Emergency and Comfort Ventilation Simulations, (8 stations, 8.5 km), PROTA, İstanbul, 2017 -
-
İkitelli – Ataköy Metro System Emergency and Comfort Ventilation Simulations, (11 stations, 12km), PROTA, İstanbul, 2017 -
-
İzmir LRS, Emergency and Comfort Ventilation Simulations, (11 stations, 13km), PROTA, İzmir, 2017 -
-
Code Based Design and Performance Analysis of Natural Smoke Ventilation System for Üsküdar – Ümraniye – Çekmeköy Metro System Car Parks and Maintenance Shops, PROTA, İstanbul, 2017.
-
CFD analysis for Fire Spread Through Glazing Surfaces in Üsküdar – Ümraniye – Çekmeköy Metro System Car Parks and Maintenance Shops, PROTA, İstanbul, 2017.
-
Dudullu - Bostancı Metro System Emergency and Comfort Ventilation Simulations, (13 stations, 14.2km), Emay, İstanbul, 2016 -
-
Kabataş-Mecidiyeköy-Mahmutbey Metro System Emergency and Comfort Ventilation Simulations, (16 stations, 22km), PROTA, İstanbul, 2016 -
-
Selçukgazi Road Tunnels (1 Tunnel, 2 Tubes, 1200m) Emergency and Comfort Ventilation System Design, Özgen, Bursa 2016
-
Gümüşhane Road Tunnels (5 Tunnels, 10 Tubes, max. 2500m) Emergency and Comfort Ventilation System Design, TTS, Gümüşhane, 2015
-
Investigation of Effect of PSD Height on Emergency Ventilation Characteristics of Fıstıkağacı Metro Station, İstanbul Ulaşım, İstanbul, 2015
-
Riva and Çamlık Road Tunnels (2 Tunnels, 4 Tubes, max. 800m) Emergency and Comfort Ventilation System Design, YPU, Antalya, 2015
-
Halit Ulukurt and Vecdi Diker Road Tunnels (2 Tunnels, 4 Tubes, 750m) Emergency and Comfort Ventilation System Design, İSBAK, İstanbul, 2015
-
Salmankaş Road Tunnels (1 Tunnel, 2 Tubes, 4029m) Emergency and Comfort Ventilation System Design, TTS, Gümüşhane, 2015
-
Vezneciler – Edirnekapı – Eyüp – GOP – Sultangazi Rail System Emergency and Comfort Ventilation Simulations, (15 stations, 17km), BOTEK, IDOM, İstanbul, 2016
-
Calculation of Pressure Transients in T53 and T61 Tunnels in Köseköy-Gebze High Speed Train Project, ARI Project, İstanbul, 2014
-
Üsküdar – Ümraniye - Çekmeköy Metro System Emergency and Comfort Ventilation Simulations, (16 stations, 20km), PROTA, Ankara, 2013
-
Warsaw Underground Line II, Emergency and Comfort Ventilation Simulations, (7 stations, 7km), PROTA, Warsaw, 2013
-
Warsaw Underground Line II, Human Evacuation Simulations, (7 stations), PROTA-ILF, Warsaw, 2013
-
Skopje Mixed Use Center, Road and Light Rail Tunnel (1000m), Emergency and Comfort Ventilation System Design, 2013
-
Cophenagen, Cityringen Branch Emergency and Comfort Ventilation Simulations, Preliminary Study, Gülermak, Cophenagen, 2013
-
Avrasya Road Tunnel (1 Tunnel, 2 Tubes, 5600m) Emergency and Comfort Ventilation Simulations, Yapı Merkezi, İstanbul, 2011
-
Taksim Square Underpass Tunnels (pedestrian and vehicle tunnels network) Emergency and Comfort Ventilation System Design and Simulations, Emay, İstanbul, 2011
-
Levent –Ayazağa Line, Consultancy on Emergency Egress Structures, Doğuş-Gülermak, 2011
-
Kartal – Kadıköy Metro System Emergency and Comfort Ventilation Simulations Consultancy Work (16 stations, 22km), Yüksel Proje, 2010
-
İzmir Metro System, Üçyol-Fahrettin Altay Line (3rd Phase) Emergency and Comfort Ventilation Simulations (4 stations, 2km), ÖZTAŞ, İzmir, 2010
-
İzmir Metro System, Hastane-EVKA Line (3rd Phase) Emergency and Comfort Ventilation Simulations (3 stations, 2.1km), ESER, İzmir, 2009
-
Sanayi – Darüşafaka Metro System Emergency and Comfort Ventilation Simulations (4 stations, 4 km), Yüksel Proje, İstanbul, 2009
-
Istanbul metro System, Levent - Ayazaga Emergency and Comfort Ventilation Simulations (7 stations, 7km), Yüksel Proje, İstanbul, 2008
-
Taksim – Unkapanı Metro System Emergency and Comfort Ventilation Simulations (2 stations, 2km), Arı Proje, 2007
-
İstanbul Kirazlı - Başak Konut – Olimpiyat Metro System Emergency and Comfort Ventilation Simulations (11 stations, 16km), Bahri Türkmen, 2007
-
Ankara Metro System, TRT-Mesa Metro Line (M3), Emergency and Comfort Ventilation Simulations (3 stations, 2.4km), Güriş İnş. AŞ. Ankara, 2007
-
Ankara Metro System, Kızılay-Söğütözü Metro Line, Emergency and Comfort Ventilation Simulations (4 stations, 5.1km), Güriş İnş. AŞ. Ankara, 2006
-
Istanbul Metro System, Otogar - Bagcilar Emergency and Comfort Ventilation Simulations (6 stations, 5.5km), Bahri Türkmen, İstanbul, 2006
-
Ankara Metro System, Ulus-Keçiören Metro Line, Emergency and Comfort Ventilation Simulations (11 stations, 9.2km), Yüksel Proje, Ankara, 2006
-
Krakow Fast Tram System, Poland, Emergency and Comfort Ventilation Simulations (7 stations, 5.8km), Güriş, Krakow, 2004
-
Ankara Metro System, Söğütözü-Çayyolu Metro Line, Emergency and Comfort Ventilation Simulations (9 stations, 11.3km), Yüksel Proje, Ankara, 2004
Life and Fire Safety Engineering Related - Participated as Design Engineer or Project Manager
-
Konak Mixed Use Center (3 High Rise Buildings -2 different occupancy types: office and residential-, Shopping Mall and Undergorund Car Parks), Qualitative and Quantitative Fire Risk Assessment and Performance Based Fire Protection System Design, Rönesans-Tekfen, İzmir, 2017
-
Konak Mixed Use Center (3 High Rise Buildings -2 different occupancy types: office and residential-, Shopping Mall and Undergorund Car Parks), Simulation of Design Fire Scenarios, Rönesans-Tekfen, İzmir, 2017
-
Gaziantep State Hospital, Consultancy on and Preparation of Life and Fire Safety Projects, Stuido Altieri, 2015
-
Marmaray Tunnel, Consultancy on and Preparation of Life and Fire Safety Projects, PROTA, 2014
-
Üsküp Mixed Use Center, Preparation of Life and Fire Projects and Field Examination for The Installation of Related Systems, Limak, 2013
-
Üsküdar-Ümraniye-Çekmeköy Metro System, Preparation of Life and Fire Safety Projects, PROTA, 2013
-
Etlik State Hospital, Consultancy for Life and Fire Safety Projects, NKY Mimarlık, 2013
-
Teknopark (Gebze) – Field examination for Life and Fire Safety systsems, Limak, 2013
-
TCDD – District 1 - Field examination of 76 Train Stations and determination of Life and Fire Safety requirements for each station, TCDD, 2011
-
Enerjisa - Tufanbeyli Thermoelectric Power Plant – “Code Analysis” Report, Enerjisa, 2011
-
Trump Towers Pedestrian Subway- Life and Fire Safety Consultancy, 2011
-
GIMAT Shopping Center- Life and Fire Safety Consultancy, Fema Mimarlık, 2011
-
Doğuş/Gülermak Ortaklığı – Field Examination and determination of Life and Fire Safety requirements, Doğuş/Gülermak, 2012
-
Preparation of Fire Scenarios for Otogar-Bağcılar Metro System and Field Examination for the Installed Systems, Doğuş/Gülermak, 2011